The survey in which final alignment is selected is
a) final survey b) reconnaissance c) preliminary survey d) none
- 10905 Views
- 62 Answers
62 Answers
-
-
- 22 Jan
- 0 Comment
-
- any one added me in civil engineering group in watsapp
- I need to get mtech admission in IIT madras..what is the mark range for that?
- The bearing capacity of a strip footing on a saturated clay is 120 KN/m2. The bearing capacity of a circular footing (diameter=width) will be.
1. more then 120
2. less then 120
3. equal to 120
4.all
- wrought iron contain corbon up to ???
- any body tell me a gate syllabus for civil engg 2016
- what is a phreatic line of an earth dam ?
- Where can I find the good books for GATE Civil Engineering (CE)?
- what are the tips and tricks to study for GATE CE?
- what are the guidelines to crack gate?
- what is gate cutoff for mtech in coep ?