22 उत्तर
- It takes 10 s and 15 s, respectively, for two trains travelling at different constant speeds to completely pass a telegraph post. The length of the first train is 120 m and that of the second train is
- what is civil engineering?
- The percentage of void ratio in cement is approximately?
a) 50%
b) 40%
c) 30%
d)20%
- Any one please suggest the preparation tips for GATE Civil Engineering..
- soil has a liquid limit of 50% and plastic limit 30% . when the soil at its liquid limit is dried. the percentage decrease in volume was 40% of dry volume. when it was dried from its plastic limit the
- Tell the exam pattern and syllabus pls
- Guy's What measured by Strain rosetters ?
- What is the syllabus for GATE Civil Engineering (CE)?
- Any one please share the syllabus of GATE Civil Engineering
- How fibre reinforced concrete prevents cracking?
मॉक परीक्षण अभ्यास के लिए
gate civil engineering (ce)
the true density of the cement under test be known, except for Portland cement when a density of 3.15 g/cm3 is assumed