SBI PO Prelim Exam Question
If 3 men can finish their work for 8 days, then how many men are needed to finish their work in 6 days? a) 5 Men b) 4 Men c) 8 Men d) None of these
- 16035 Views
- 381 Answers
381 Answers
- SBI PO Salary and Career Growth
- I want a best book for SBI po post .. can anyone suggest book name
- manage time in SBI po
- give me tricks to manage time
- 15 min reading time?
- A bottle contains three-fourth of milk and the rest water. How much of the mixture must be taken away and replaced by an equal quantity of water, so that the mixture has half milk and half water?
- I have tried Grade up series. They have totally different question pattern. So now I am confused. Please guide me.
- find the actual profit% of the shop keeper when he tampered weighing machine that shows 950 gm instead of 1 kg?
- the traffic lights at three different road crossings change after every 48sec,72sec and 108sec.respectively.if they all change simultaneously at 8:20:00 hours,then at what time will they again change
- the topics which u had given that covers prelims rite??
Practice Mock Test
sbi po prelim exam
Number of men * 6 days = 24 man-daysbr /br /Now, solve for the number of men:br /br /Number of men = 24 man-days / 6 days = 4 menbr /br /So, the answer is (b) 4 Men