Over taking time required for a vehicle with design speed of 50km/h and overtaking acceleration 1.25m/s2 to overtake a vehicle moving at a speed of 30 km/ h is...
please solve it
- 3189 Views
- 5 Answers
5 Answers
- Where can I find the good books for GATE Civil Engineering (CE)?
- Hello I have one doubt what is negative marks in gate exam if I can do any mistake it nu will reduce the mark but I will attend only correct and rest of questions I leaved
- The bearing capacity of a strip footing on a saturated clay is 120 KN/m2. The bearing capacity of a circular footing (diameter=width) will be.
1. more then 120
2. less then 120
3. equal to 120
4.all
- What are the cutoff marks for the GATE 2015?
- please suggest me .some important tips for dfccil exam ?
- What is the minimum GATE (CE) score required in IIT for civil engineering?
- GATE CIVIL ENGINEERING BOOKS - RECOMMEND SOME BOOKS PLEASE?
- What will be the cutoff of the GATE 2018 (civil branch)?
- any body tell me a gate syllabus for civil engg 2016
- The percentage of void ratio in cement is approximately?
a) 50%
b) 40%
c) 30%
d)20%
Practice Mock Test
gate civil engineering (ce)
insufficient data