how can prepare for gate.There is only 3 months left
preparations strategy
- 1873 Views
- 1 Answers
1 Answers
-
-
- 02 Oct
- 0 Comment
-
- After b.tech civil exams for various field?
- Gate civil engineering why gate is necessary and how it's beneficial
- The bearing capacity of a strip footing on a saturated clay is 120 KN/m2. The bearing capacity of a circular footing (diameter=width) will be.
1. more then 120
2. less then 120
3. equal to 120
4.all
- How one can prepare for. Gate from 2nd year?
- The Specific gravity of Quartz is ?
- can i get daily 20 questions for each subject
- question is regarding survey
a survey line was measured to be 60m. it was found that there is misalignment and line was 1m off straight at middle. the correction in length in m is?
- Sir give me ans plss different between axisymmetric elements and parammetric elements
- What are the cutoff marks for the GATE 2015?
- what is a phreatic line of an earth dam ?
Practice Mock Test
gate civil engineering (ce)
we can through sharing info and being focused.