Question from aptitude for Unisys.
Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men work to complete the job? (a) 8 hrs (b) 7 1/2 hrs (c) 7 hrs (d) 9 hrs (e) none of these options
- 1554 दृश्य
- 2 उत्तर
2 उत्तर
-
-
- 17 जून
- 0 टिप्पणी
-
-
strongAnswer is option (e)/strongbr /br /strongExplanation: /strongbr /br /?30 * 20 * 9 = 5400 man-hours required to complete the jobbr /:br /Let x = no. hrs a day to do the same job (assuming in 20 days)br /40 * 20 * x = 5400br /800x = 5400br /br /x = 5400/800br /br /x = strong6.75 hrs/strong a day for 20 days to do the same job
-
- 17 जून
- 0 टिप्पणी
-
- What are the Skills Required for the post of Technical Support Engineer.
- what are the suggested tips for the exam
- What is Unisys ? What do they do?
- Eligibility for Unisys placement
- what is the Selection process in Unisys?
- What is the highest salary package Unisys gives?
- Is Unisys is a BPO?
- What is Voice round; I have heard a lot about this round.
- Tech support job is like a calling job?
- Signing a bond is necessary in Unisys?
मॉक परीक्षण अभ्यास के लिए
unisys
good job! well done